Key events 2007 – 2017

2007
MAY
Samruk-Energy” joint-stock company was established
NOVEMBER
The first issue of shares was registered
2008
MAY
A decision to create and construct a Balkhash TPP with a design capacity of up to 4000 MW was made
NOVEMBER
95.8% of shares were transferred to «Sovereign Wealth Fund «SamrukKazyna» JSC, 4.2% of shares to «KazTransGas» JSC
DECEMBER
Acquisition of a 50% stake in Forum Muider, which owns 100% stake in the equity capital of “Bogatyr Komir” LLP
2009
The commissioning of 9 substations in Almaty, the capacity increase was 488 MVA
JULY
Acquisition of a 100% stake in the authorized capital of “Alatau Zharyk Company” JSC
2010
MAY
The commissioning of substations No.137А “Central“ (2nd stage) and “Sayran“ in Almaty city
NOVEMBER
The commissioning of “Novaya No.16” substation in Almaty region Putting facilities for reconstruction of substations “Beineu“, “Umirzak“ in Mangistau region into operation
DECEMBER
The commissioning of substations Medeu, Shymbulak, KazGU, Yermensay in Almaty
2011
APRIL - JUNE
Acquisition of 100% stake in the authorized capital of “SamrukEnergy Stroy Service” LLP
Acquisition of 50% stake in “Ekibastuz SDPP-1 named after Bolat Nurzhanov” LLP
Acquisition of a 100% stake in the authorized capital of “AlmatyEnergoSbyt” LLP
OCTOBER
Joining the UN Global Compact
DECEMBER
All common shares of “Samruk-Energy” JSC held by “KazTransGas” JSC were transferred to the trust management of “Samruk-Kazyna” Sovereign Wealth Fund” JSC
Acquisition of a 100% stake in equity capital of “Tegis Munay” LLP, which owns 100% of “Mangyshlak-Munay” LLP
2012
JANUARY
A decision to create “Samruk-Green Energy” LLP was taken
AUGUST
Acquisition of 43.65% stake in «Almaty Power Plants» JSC
OCTOBER
Acquisition of a 50% stake in “Ekibastuz SDPP-1 named after Bolat Nurzhanov” LLP
Acquisition of 100% of shares in the authorized capital of “First Wind Power Plant” LLP by “Samruk Green Energy” LLP
DECEMBER
Placement of the first Eurobonds on the Irish and Kazakhstan stock exchanges
Kensai substation with a 220 kV power line Kensai of CHP-3 in Almaty region was put into operation
2013
MARCH
3rd place in the nomination “The best employer company in “two capitals “of the Republican contest “Senim-2012”
AUGUST
The commissioning of “Mamyr” substation in Almaty region
DECEMBER
Commissioning of a 2 MW solar power plant in Kapshagai city Acquisition of a 100% interest in the authorized capital of “Kazhydrotechenergo” LLP
Putting into operation of Almaty CHP-2 III stage in Almaty city
2014
MAY
Commissioning of closed type “Esentai” substation

2015
AUGUST
Launch of the wind power plant “First Wind Power Plant” LLP Putting into operation “Besagash”, “Mamyr”, “Altay” substations in Almaty
DECEMBER
Receiving the Grand Prix of the President’s Prize “Paryz” 2015 World rating agency Standard & Poor’s confirmed the credit rating at the level of “BB”, short-term credit rating at the level of “B”. The outlook for the rating change is “Stable”

2016
APRIL
Opening of the Regional Dispatch Center in “Mangistau Distribution Power Grid Company” JSC
Resumption of electricity exports to Russia and Kyrgyz Republic
MAY
Commissioning of turbine unit No.3 of “Aktobe CHP” JSC
SEPTEMBER
Commissioning of boiler unit No. 8 of CHP-2 of “Almaty Power Plants” JSC
NOVEMBER
Upgrading of 500 kV outdoor switchgear at “Ekibastuz SDPP-1” LLP was completed